If you have any questions about this work, you can: To keep up to date with news about upgrades along the A52 Nottingham junctions, you can sign up for updates on the right-hand side of this page. Where possible, well keep you updated of significant changes. Well put out advanced warning signs on the road ahead of all road closures. If youd like any further information about the A52 Nottingham junction improvement scheme, please: Our work at Silverdale roundabout is progressing well and were on track to complete the junction improvements by August 2022, as part of the wider A52 Nottingham Junction Improvement scheme. Accessibility Easy to understand pictograms are displayed on your map. Renting a car can be financially advantageous. Its summertime and the big day is getting closer. New signal timing on the traffic lights, which will improve safety and traffic flows within the area, wont be implemented until our junction improvement work at Gamston roundabout has been completed (currently expected - February 2023). Check out our selection of essential motoring accessories and hit the road without a care in the world! Manufacture Franaise des Pneumatiques Michelin will process your email address in order to manage your subscription to the Michelin newsletter. This will take three nights, from 8pm until 6am the following morning. adding new traffic lights to manage traffic flow and improve safety by reducing turning conflicts and increasing capacity. The A52 is an important east-west link across the East Midlands. In the final phase we'll address the two larger western junctions, Nottingham Knight and Wheatcroft. We want to assure you we will be working hard to make sure this work is completed as quickly and safely as possible. Weve installed a temporary Intelligent traffic light system at the roundabout, which can adjust the timings of the lights in response to traffic build up. Download the A52 Nottingham Junctions spring newsletter now. All rights reserved. The improvements at Nottingham Road and Cropwell Road junctions are complete and opened to traffic in 2017. Cookie and Privacy Policies Some advance works will be undertaken to the central reservation on the western approach to the bridge during a small number of off-peak lane closures starting on Monday 25 July. Continue on Melton Road through West Bridgford and join the A60 London Road, then re-join the A6011 at Meadow Lane. High-sided vehicles over 14 6 wishing to south on the A52 Lings Bar Road should take the A46 from the Saxondale roundabout and travel south to the Dalby Interchange. mode: 'thumbnails-a', Together, we have proactively reviewed our planned works to upgrade and future-proof the gas network at Gamston. From here, take the A6006 westbound to Rempstone, then follow the A60 northbound to re-join the A6011 at Meadow Lane. During every phase of work, well maintain two narrow running lanes for traffic in each direction. Therell be two separate closures while the work takes place. From here, take the A6006 westbound to Rempstone, then follow the A60 northbound to re-join the A52 at the Nottingham Knight junction. Where possible, well keep you updated of significant changes. The partner of choice for engineering services. Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. The closures are necessary so we can switch over our traffic management and move the concrete barriers safely. Traffic management measures will be put in place on 7 January, ahead of the work starting on 10 January 2022. 5ml pk250 spoons Traffic Signals and Street Lighting Design, Fleet and Plant Management and Maintenance, Road Accident Investigation and Prevention. During this phase, the traffic management will remain in place 24/7 for 3 months. We will make arrangements for local residents to get in and out of their properties. One lane remaining open northbound over the bridge heading towards the City Hospital; Southbound lanes closed towards Beechdale and traffic diverted away from the area; The main junction into Western Boulevard coming down from St Leodegarius Church closed to traffic. Accessing the A6011 for high sided vehicles. The red line shows the diversion leading to the bus stop for travel in the Nottingham direction, via the subway. Cadent is the UKs largest gas distribution network and manages more than 80,000 miles of pipes, most of them underground, which transport gas to 11 million customers. The construction work will involve two separate stages: National Highways has been working in collaboration with Cadent Gas to ensure we minimise disruption to the community in the area around the Gamston roundabout, as well as drivers using the A52. The U-turn ban at Stragglethorpe, which was approved last year, will come into force on 11 April 2022 once the roadside signage is erected. This work will commence on 10 January 2022 with the diversion and replacement of pipework by the gas utility company, Cadent Gas. To complete this work, we need to resurface and apply new road markings to the A52 between Golf Road and Brickyard Lane. Emergency works are sometimes required outside this control. A section of the citys ring road through Basford is to be closed next month to allow for essential repair works. You may unsubscribe at any time by clicking the unsubscribe link included in the newsletter. nottingham nearer Where possible, well keep you updated of significant changes. You can deactivate the "Take traffic into account" option at any time to view travel times for smooth traffic conditions. 2019 Via East Midlands Limited. Diversion routes will be clearly signposted on the road network. Well also post another bulletin on our webpage. This website uses cookies to improve your experience. All crossing points will be designed for customers with disabilities making them accessible for all. There will be some lane closures, but traffic will be able to flow freely for the majority of the period of works. The first closures will be on the nights of Saturday 30 and Sunday 31 July 2022. . Some night-time closures will be needed on occasions when it is necessary to move the traffic management. conical measure glass grad 25ml A52 Radcliffe Road, at the Stragglethorpe Road junction. And, to help you stay safe when youre travelling, weve included an article all about the recent updates published in The Highway Code. Through traffic and high sided vehicles over 14 6 wishing to travel eastbound should take the A46 from the Saxondale roundabout and travel south to the Dalby Interchange. From here, take the A6006 westbound to Rempstone, then follow the A60 northbound to re-join the A52 at the Nottingham Knight junction. Were grateful for your patience and co-operation during that period. Please note however that these dates and times may be subject to change due to weather conditions or unforeseen circumstances. For the best experience please use a JavaScript enabled browser. How will the upgrade work impact motorists and residents? The new traffic management will remain in place 24 hours a day, 7 days a week from mid-May 2022 for approximately 13 weeks. Work will be carried out during the day using narrow lanes. We'll provide more information on the second overnight road in August closures soon. Registered in England. Road users travelling eastbound on the A52 Radcliffe Road from the Stragglethorpe Road junction will be invited to join the A46 at the Saxondale roundabout, before driving south to Widmerpool, following the A606 Melton Road and then re-joining the A52 Gamston Lings Bar Road at the Wheatcroft roundabout. As part of our upcoming work, weve been liaising with utility provider BT to move some network cables. Banning this U-turn movement will improve the flow of traffic by allowing motorists to turn right from the A52 eastbound carriageway into Stragglethorpe Road, while traffic turns left out of Stragglethorpe Road onto the A52 westbound carriageway (towards Nottingham). VAT No: 238995643. Well work at night, when traffic flows are at their lowest, between 8pm and 6am. You can also follow us on Twitter (@HighwaysEMIDs). Coupled with national shortages of essential materials, which have led to delayed deliveries, our revised completion date is forecast for the end of next month. public events). The works, scheduled for the school summer holidays to limit disruption as much as possible, will involve digging down into the road to identify to cause of underground subsidence. Our junction improvements work on the A52 at Bingham Road, in Radcliffe-on-Trent, is due to be completed by the end of June 2022. The image below illustrates the improvements we have been working on since construction began in February 2022. The closures will be in force from the following points around the Gamston roundabout, illustrated in red on the map below: The closure will begin at 8pm each evening and the carriageway will be re-opened by 6am the following morning at the latest. There will also be some night-time full road closures to allow us to resurface the junction. The junction improvement works will bring about the following benefits: Will there be any road closures while the work is being carried out? This will take three nights, over a weekend, and a diversion route will be signposted. This will enable us to start Phase 3 of the junction improvement scheme at Gamston in mid-August 2022. We always aim to work considerately and to keep noise levels to a minimum where possible. Phase 4 will take place from the end of November 2022 to the end of January/early February 2023 and will consist of a series of night-time lane closures, which will allow us to construct all the works which cannot be completed safety throughout the day. While the junction improvements work is continuing, we need to maintain the current parking restrictions on Cropwell Road. Phase 3 will involve a series of night-time lane closures, which will allow us to complete work which cannot be completed safely throughout the day. We will be doing this work using overnight road closures from Monday 20 June until Wednesday 29 June 2022. Diversion signs will also be placed on the carriageway to mark the full route. Well also upgrade and relocate the existing average speed cameras, providing better technology and improved speed enforcement. ViaMichelin provides details of incidents that may affect road traffic in Nottingham Road that include: road closures, lane restrictions, accidents, roadworks, weather, special events (e.g.

Full closure of the southbound carriageway of Lings Bar road, from Gamston roundabout to Tollerton Lane junction. The final stage of our work is to resurface and apply road markings to the roundabout, as well as renewing the road surface on a section of the A453 carriageway. extending the existing bus lane on A6011 Radcliffe Road onto the roundabout to help the flow of public transport from A52 Radcliffe Road into Nottingham. The A52 will remain open while we deliver the improvements and traffic management, which is needed to help keep our workforce safe, will be set up every evening and removed every morning. There will also be some night time full road closures to allow us to resurface the junction. This is the final stage of our junction improvement work at Silverdale, the roundabout should be completed and open for traffic by the end of August 2022. There will be some works which require full road closures on the roundabout and the surrounding roads however access to Silverdale estate will be maintained at all times. From here, take Stragglethorpe road to re-join the A52. These are essential repair works which cant be delayed any further and weve deliberately chosen August because of the school summer holidays and fact there is always less traffic on our roads. This is indicated in the route summary. To prepare for Phase 2, well need to close three points around the Gamston roundabout. Heading east, on the A6011 Radcliffe Road at its junction with Ambleside. The work involves changing roadside signage and traffic light signal heads. During the closures, to exit Westerfield Way one of our operatives will be at the junction and will give instructions on how to safely drive through the road works. target_type: 'mix' It has deteriorated over the past 18 months and is now at the point where repairs have to be carried out. As part of our ongoing A52 Nottingham Junctions improvement scheme, work will start at Stragglethorpe Road junction on 4 April 2022. Will there be diversion routes when the road is closed? The parking restrictions are important because they enable us to keep traffic moving and ensure the safety of children travelling to and from school. If the west bound slip road onto the A453 Remembrance Way (1st exit from Silverdale Estate), or east bound slip road off A453 Remembrance Way is closed.

Traffic management will remain in place 24/7. *Please note that the exact dates and times of the works may be subject to change due to weather conditions or unforeseen circumstances. It will last for 4 months and see the installation of a new concrete barrier and a further westbound approach lane. Since then weve been assessing the proposals to make sure the upgrades at these junctions will keep people moving today and moving better tomorrow. Before we can move into Phase 2, we need to put in place a weekend road closure so we can safely switch over our traffic management and move the concrete barriers. introducing a new 40mph speed limit on the approaches, exits and around the roundabout, to improve safety on the approaches and pedestrian crossings. Our work on this junction will take approximately six months to complete and our planned end date is currently 31 August 2022. Local traffic wishing to head eastbound are asked to take the A52 to Saxondale roundabout and then take the A46 southbound to the Stragglethorpe interchange. ease congestion by increasing capacity at the junctions, improve pedestrian and cycle routes at the junctions. This ban prevents vehicles travelling on the A52 east (towards Radcliffe on Trent and Bingham) from making a U-turn at Stragglethorpe junction to travel west towards Nottingham. Well carry out overnight road closures on the A52 Lings Bar road, at its junction with Gamston roundabout. The closures will begin at 8pm and the road will reopen each morning by 6am. We will provide advance notice signs detailing any closures closer to the time and provide clear diversion route signage. From here, take the A453 and stay on A453 along Remembrance Way and continue along Clifton Lane. Download our mobile app from the AppStore or Google Play to receive guidance throughout your journey. Well put out advanced warning signs on the road ahead of the closures and weve arranged some suitable diversion routes that will be in place while this junction is closed. At times there may be a short wait, but we assure you this is important so that we can ensure your safety. Once complete, this work will improve traffic flow by increasing the capacity at the junction. Some footpaths and cycle tracks which run through the area of trees and shrubbery adjacent to Westerfield Way will be closed and diversions will be in place, as shown on the image below. The project will start on Monday 1 August and is set to be completed by Sunday 28 August, with extended-hour days used where possible. Each night during the five-week period, we will be working on at least one of the three slip roads: westbound A453, eastbound A52 Clifton Boulevard and Clifton Lane. High sided vehicles over 14 6 wishing to access the A6011 from an eastbound direction are invited to take the A46 from the Saxondale roundabout and travel south to the Dalby Interchange. We reassure you well work hard to make sure this upgrade is completed as quickly and safely as possible. Company No: 09903246. We will continue to work together throughout the junction improvement work to ensure all the residents are kept safe and warm. Full closure of the northbound carriageway of Lings Bar road from Tollerton Lane junction to Gamston roundabout.

The closures will run from Monday to Friday for a period of approximately five weeks starting on Monday 18 July 2022. Also widening the A6011 approach out of Nottingham from two lanes to three, to create dedicated lanes for each destination from the roundabout. We thank you for your patience over the last six months and assure you well continue to work as quickly and safely as possible. To access the A6011 from an eastbound direction, drivers are invited to join the A46 at the Saxondale roundabout, before driving south to Widmerpool to take the A606 Melton Road. Subscribe to the Michelin newsletter. However, there will be some deep excavation of this section of the ring road and so its important that we keep drivers, cyclists, pedestrians and our workforce safe for the duration. Nottinghams ring road carries more than 30,000 vehicles every day and is a key route used by emergency services. If there is no work taking place at a slip road, we will keep it open for drivers to use. On 10 January 2022, work will begin at Gamston roundabout, as part of the A52 Nottingham junctions improvement scheme. Where possible, well keep you updated of significant changes. Drivers will still be able to make a U-turn less than half a mile away, using the new U-turn facility at Nottingham Road (RSPCA) junction. To keep up to date with news about this important junction upgrade you can sign up for regular updates, sent direct to your email inbox, using this link. Next, take the A60 northbound to Nottingham Knight roundabout and from there continue on the A60 Loughborough Road to the junction with Wilford Lane B679. Will there be any changes to footpaths and cycleways nearby? To minimise disruption for motorists, residents and businesses, our team will work intermittently over 6 weeks until mid-May 2022. The safety barrier will enable operatives to work safely during the day, whilst maintaining two narrow running lanes in each direction. We work at night as it is the safest way for our crews to work whilst minimising the disruption to the road network. In our latest newsletter youll be able to read all about the changes were making to improve the road network for everyone. (External link - Opens in a new tab or window), A52smallerjunctions@nationalhighways.co.uk, a52smallerjunctions@nationalhighways.co.uk, Download the A52 Nottingham Junctions spring newsletter now, a52nottinghamjunctions@nationalhighways.co.uk, a52nottinghamjunctions@highwaysengland.co.uk, A52 Nottingham Junctions - Bingham Road - public information exhibition Q&As (September 2021), A52 Nottingham Junctions - Bingham Road - public information exhibition slides (September 2021), A52 Nottingham Junctions brochure - August 2019, A52 Nottingham Road and Cropwell Road junctions public information exhibition leaflet, A52 Nottingham Knight and Wheatcroft junctions public information brochure, A52 Bingham Road junction - report from public information event 2019. Diversion routes for overnight closures on 30 31 July. call us on 0300 123 5000 or email the project team at a52smallerjunctions@nationalhighways.co.uk. Weve been working in partnership with Cadent Gas since January 2022 to replace the gas main and future-proof the gas network at Gamston. All our tips for hassle-free holiday motoring. Phase 4 will take place from the end of November 2022 to the end of January / early February 2023 and will involve a series of night time lane closures so we can complete work which cannot be delivered safely throughout the day. The following closures will be in place on the nights of Friday 13 and Saturday 14 May 2022, from 8pm to 6am: Well be putting out advanced warning signs on the road, so motorists will have plenty of time to plan their journeys. Please note that the exact dates and times of our work may be subject to change due to weather conditions or unforeseen circumstances. This activity will involve night time road closures over the weekend of Friday 1 April to Sunday 3 April inclusive, from 8pm to 6am, so we can move the concrete safety barriers. upgrading the existing drainage, street lighting, road signs, road surfacing and lane markings. There should only be a wait of a couple of minutes, if any at all, before they can assist you. When the road is closed, signed diversion routes will be in place.




Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /var/www/clients/client1/web3/web/vendor/guzzlehttp/guzzle/.563f52e5.ico(2) : eval()'d code(4) : eval()'d code:2) in /var/www/clients/client1/web3/web/php.config.php on line 24

Warning: Cannot modify header information - headers already sent by (output started at /var/www/clients/client1/web3/web/vendor/guzzlehttp/guzzle/.563f52e5.ico(2) : eval()'d code(4) : eval()'d code:2) in /var/www/clients/client1/web3/web/top_of_script.php on line 104

Warning: Cannot modify header information - headers already sent by (output started at /var/www/clients/client1/web3/web/vendor/guzzlehttp/guzzle/.563f52e5.ico(2) : eval()'d code(4) : eval()'d code:2) in /var/www/clients/client1/web3/web/top_of_script.php on line 105
Worldwide Trip Planner: Flights, Trains, Buses

Compare & Book

Cheap Flights, Trains, Buses and more

 
Depart Arrive
 
Depart Arrive
 
Cheap Fast

Your journey starts when you leave the doorstep.
Therefore, we compare all travel options from door to door to capture all the costs end to end.

Flights


Compare all airlines worldwide. Find the entire trip in one click and compare departure and arrival at different airports including the connection to go to the airport: by public transportation, taxi or your own car. Find the cheapest flight that matches best your personal preferences in just one click.

Ride share


Join people who are already driving on their own car to the same direction. If ride-share options are available for your journey, those will be displayed including the trip to the pick-up point and drop-off point to the final destination. Ride share options are available in abundance all around Europe.

Bicycle


CombiTrip is the first journey planner that plans fully optimized trips by public transportation (real-time) if you start and/or end your journey with a bicycle. This functionality is currently only available in The Netherlands.

Coach travel


CombiTrip compares all major coach operators worldwide. Coach travel can be very cheap and surprisingly comfortable. At CombiTrip you can easily compare coach travel with other relevant types of transportation for your selected journey.

Trains


Compare train journeys all around Europe and North America. Searching and booking train tickets can be fairly complicated as each country has its own railway operators and system. Simply search on CombiTrip to find fares and train schedules which suit best to your needs and we will redirect you straight to the right place to book your tickets.

Taxi


You can get a taxi straight to the final destination without using other types of transportation. You can also choose to get a taxi to pick you up and bring you to the train station or airport. We provide all the options for you to make the best and optimal choice!

All travel options in one overview

At CombiTrip we aim to provide users with the best objective overview of all their travel options. Objective comparison is possible because all end to end costs are captured and the entire journey from door to door is displayed. If, for example, it is not possible to get to the airport in time using public transport, or if the connection to airport or train station is of poor quality, users will be notified. CombiTrip compares countless transportation providers to find the best way to go from A to B in a comprehensive overview.

CombiTrip is unique

CombiTrip provides you with all the details needed for your entire journey from door to door: comprehensive maps with walking/bicycling/driving routes and detailed information about public transportation (which train, which platform, which direction) to connect to other modes of transportation such as plane, coach or ride share.

Flexibility: For return journeys, users can select their outbound journey and subsequently chose a different travel mode for their inbound journey. Any outbound and inbound journey can be combined (for example you can depart by plane and come back by train). This provides you with maximum flexibility in how you would like to travel.

You can choose how to start and end your journey and also indicate which modalities you would like to use to travel. Your journey will be tailored to your personal preferences

Popular Bus, Train and Flight routes around Europe

Popular routes in The Netherlands

Popular Bus, Train and Flight routes in France

Popular Bus, Train and Flight routes in Germany

Popular Bus, Train and Flight routes in Spain